Recovery Optimisation
Recovery Optimisation can be completed for operating mines or for mines under study.
It results in the generation of draw strategies that will produce the optimal recovery and dilution mix for a given orebody.
The use of shutoff algorithms in PGCA allows calculation of tonnes and grade curves which can be used to locate the optimal grade position for a given orebody and mining method.
This can then be used to generate an associated mine schedule.