Mine Scheduling
Once optimal draw tonnages have been generated for a caving layout, production from these drawpoints can be scheduled to meet infrastructure, equipment and geotechnical constraints.
The example block caving sequence and 5mt schedule shown here were generated automatically using PGCA’s scheduling module, taking into account various construction and drawpoint ramp-up constraints.