Mining Studies
Using PGCA and DMM software, we can take a raw block model and rapidly generate mining design options for Mining Studies.
This work includes optimization of footprint location, optimised production scheduling and generation of production and recovery forecasts.
The example below shows the same block model assessed for suitability for mining by sublevel cave, single lift block cave and double lift block cave design options.
The speed of recovery modelling and scheduling possible using PGCA and DMM allows the generation of many different mining options in shorter time frames.